Modernisation and maintenance

Benefits for you

Modernisation and maintenance of the Metro service brings big benefits to customers:

  • A smoother, more comfortable and more reliable journey
  • Brighter, safer and more comfortable stations
  • Easier and more flexible ways of paying for travel
  • Reduced fare evasion
  • Securing a Tyne and Wear Metro service for years to come
A Tyne and Wear Metro train arriving at Haymarket Metro station

Investment so far

A total of £446m has been invested in the renewal and maintenance of Metro infrastructure since work began in 2010.

Metro infrastructure modernisation work includes:

  • 46 new Metro trains built, with all trains in service by the end of 2026
  • 35 stations refurbished
  • 65km of track renewed or refurbished
  • 52 switches and crossing renewed or refurbished
  • 52 sets of points motors replaced
  • 6.5km of track drainage installed
  • 33km of cable troughing refurbished
  • 85km of signalling cable replaced
  • 62 bridges structurally repaired
  • 3 bridges completely replaced or replaced
  • 5 bridges removed in their entirety and infilled
  • 27 escalators and 12 lifts replaced
  • A new rail tamping machine bought
  • 2km of earthworks repaired through ballast retention and stabilisation
  • 65km of overhead line replaced
  • Replacement of help points, the public address system and 500 CCTV cameras
  • A new Radio System installed
  • A new Rail Traffic Management System (RTMS) installed
  • In addition to that, the Metro Flow project was a £104m investment, dualling the Metro track in three areas in South Tyneside.

 

Journey planner icon Journey planner icon hovered

Planner

Timetables icon Timetables icon hovered

Timetables

Departures icon Departures icon hover

Departures

Travel updates icon hover Travel updates icon hover

Updates